It is currently 28 Mar 2024, 16:16

All times are UTC [ DST ]




Post new topic Reply to topic  [ 2 posts ] 
Author Message
PostPosted: 26 Apr 2014, 15:38 
Offline
BDCA Member

Joined: 18 Mar 2012, 21:57
Posts: 27
At youtube (https://www.youtube.com/watch?v=3IrHFRwi3kY). Thomas (a tank engine) has his boiler extracted as part of 10-year overhaul. All the NVR crane team are in action as the boiler is lifted out of the locomotive's frames, the ashpan detached, and then the boiler safely lowered on to packing to await removal for attention offsite.


Top
 Profile  
 
PostPosted: 26 Apr 2014, 18:40 
Offline
Site Admin

Joined: 15 Dec 2010, 22:30
Posts: 298
Location: North Cambridgeshire, UK
Excellent. I enjoyed watching the team in action, all co-operating under the watchful eye of the banksman. It was also pleasing to see the crane being operated in a smooth and timely manner.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 3 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group